Barn Raising: Day Seven

Once the shed rafters were up we started installing the floor joists for the loft. To help with the heavy lifting, we brought a pair of block and tackle setups into play. Suspended from the ridge beam, the 4 to 1 mechanical advantage allowed Marion and I to easily lift the 14-foot long 4×8 joists to the second floor.