Building the subfloor
I spent the first few hours of the morning running to the lumber yard to return the remaining bad boards and picking up the 3/4" plywood that I needed for the subfloor.

With a stack of good, straight lumber, I was ready to finish the floor joists and install the subfloor.

Just as I put the last nail in the plywood, the raindrops began to fall. The forecast is for heavy rain tonight and into tomorrow. The spell of good weather is temporarily over.
Building Gypsy Rose